Sometimes custom is cheaper
Sometimes “off the shelf” means paying for a lot you will never use.
The harness on the left has:
• 24 wires
• 6 feet of length
• We only use 5 wires
• We only need about 6 inches
That extra bulk costs install time, adds clutter, and creates more points for mistakes.
So we worked with BENCOR, LLC to build a harness that actually fits our system.
The result on the right:
• Correct wire count
• Proper length
• Cleaner installs
• Less labor time
• Fewer headaches
Same price per unit. Way better fit for our product.
This is why we value working with companies like Bencor. They listen, they adapt, and they are close enough to shake hands with. A 2.5 hour drive beats a thousand emails.
Efficiency is not about cutting corners. It is about cutting waste.